The March wind turbine, which is now fully operational, is located within the Anglian Water waste water treatment works approximately 2km outside March, Cambridgeshire.
Generation of 4.4 GWh of renewable electricity/year
Providing enough energy to power 1,000 homes
Displacement of 1,900 tonnes CO2 emissions/year
Project Page